Facility damage |
 1. Seismic intensity at the facility site |
 2. Structure of buildings where dialysis equipment is located |
 3. Completion date of buildings where dialysis equipment is located |
 4. Seismic resistance of buildings where dialysis equipment is located |
Interruption of dialysis services |
 5. Experience of the interruption of dialysis services due to the disaster |
 6. Length of time taken to resume dialysis services |
 7. Reasons for the interruption of dialysis services |
Patient transfer and schedule adjustment |
 8. Requests for dialysis support to other hospitals |
 9. Acceptance of dialysis patients from other hospitals |
 10. Number of dialysis patients accepted |
 11. Schedule adjustment due to the acceptance of patients |
 12. Schedule adjustment due to the disaster |
Disaster countermeasures at the facility (at the time of disaster/at the end of 2011) |
 13. Presence of private power generation systems that can be used for dialysis theraphy and their installation sites |
 14. Presence of water tanks (well water) for emergency use and their sizes |
 15. Earthquake-proof measures for RO systems and dialysis fluid delivery systems |
 16. Piping materials used for dialysis fluid delivery systems |
 17. Earthquake-proof measures for bedside consoles |
 18. Locking of bed casters |
 19. Means of information gathering and communication in times of disaster |
 20. Preparation of emergency release |
 21. Provision of information to patients receiving dialysis services under normal conditions |